    (1) In order to make the commissioning work smoothly, the commissioning personnel should carefully study the drawings and materials, the factory test report of the equipment manufacturer and relevant technical materials, understand the layout of the field equipment, and be familiar with the wiring of the relevant electrical systems.As the installation and commissioning personnel, we must first understand the process flow and control flow of the entire equipment, and then understand the drawings; then, in accordance with the drawings, first check the internal wiring of the equipment (in fact, refer to the drawings to compare the actual wiring);Be proficient in the various instruments used on the equipment being commissioned.