* Question
| After the control circuit is installed, what items should I check before powering up? |
* Answer
| 1.Equipment installation check
2.Wire connection check 3.Insulation inspection 4.Resistance measurement |
* Question
| After the control circuit is installed, what items should I check before powering up? |
* Answer
| 1.Equipment installation check
2.Wire connection check 3.Insulation inspection 4.Resistance measurement |

COMMENTS