Active SPI Real-Time Clock with 96B NVSRAM and Trickle Charger
Quick Engineering Summary
| Field | Value |
|---|---|
| Manufacturer | Maxim Integrated |
| Category | Clock/Timing - Real Time Clocks |
| Package | 16-PDIP |
| Core function | IC RTC CLK/CALENDAR SPI 16DIP |
| Key electrical range | Current - Timekeeping (Max): 25.3μA to 81μA @ 2V to 5V; Supply and Demand Status: Balance; Supply Voltage - Operating: 2 V to 5.5 V; Temperature Range - Operating: -40°C to 85°C |
| Workbook inventory signal | 155 pcs listed in the provided file |
Lifecycle Analysis
The DS1306N+ carries an Active lifecycle status from Maxim Integrated, indicating that the part is in full production and recommended for new designs as well as ongoing production orders. No lifecycle conflicts appear in the provided data; the Excel lifecycle parameter and status field both agree on Active. This low-risk status means procurement teams can plan with confidence for multi-year availability, though periodic revalidation of manufacturer product change notices (PCNs) remains a best practice.
While the file-supplied inventory metric of 155 units may suggest current availability, it is not a real-time guarantee. Engineers should verify live stock with authorized distributors and consider factory lead times for volume orders. For prototype builds or initial production, the Active designation typically ensures direct manufacturer support and access to full documentation. Sustaining programs should still monitor Maxim Integrated’s lifecycle communications to avoid surprises late in the product life.
Parameter Analysis
Key decision parameters for the DS1306N+ begin with its wide supply voltage range of 2V to 5.5V, enabling direct operation from coin-cell batteries or system power rails without additional regulation. The timekeeping current is specified from 25.3µA up to 81µA across this voltage range, which directly impacts battery life in backup mode. Designers must consider the worst-case 81µA figure for capacity calculations, especially when using small rechargeable cells.
The integrated 96-byte NVSRAM provides non-volatile storage for configuration or small data logs, and the SPI interface eases connection to microcontrollers. The 16-PDIP through-hole package suits prototyping and legacy boards but limits board density compared to surface-mount alternatives. Missing from the provided data are critical parameters such as clock accuracy (ppm), battery switchover thresholds, and I/O voltage compatibility. Engineers should consult the full Maxim Integrated datasheet to verify these, along with power-on reset behavior and oscillator design guidelines, before finalizing the schematic.
Application Scenario Analysis
The DS1306N+ fits strongly into battery-backed real-time clock applications where a simple SPI bus is available. Typical uses include data loggers, industrial controllers, metering systems, and embedded systems that require accurate time keeping even during power loss. Its integrated trickle charger allows direct charging of a supercapacitor or rechargeable battery, simplifying the backup power circuit. The wide operating temperature range of -40°C to 85°C makes it suitable for industrial and outdoor equipment.
Weaker-fit scenarios involve applications needing large non-volatile memory (the 96B NVSRAM is limited) or high-speed timestamping with low jitter. The through-hole package may be a disadvantage in space-constrained, high-volume SMT production, requiring manual placement or additional wave soldering steps. However, for prototyping, maintenance, and systems already using DIP packages, the DS1306N+ offers a straightforward, well-documented RTC solution with low software overhead.
RoHS Certification Analysis
The DS1306N+ is declared RoHS Compliant by the supplier, meaning it meets the European Union’s Directive 2011/65/EU as amended by 2015/863 (RoHS 3). This status is reported at the part level, implying that the component is free from lead, mercury, cadmium, and other restricted substances above allowable thresholds. For high-reliability or regulatory-critical designs, it is prudent to request lot-specific certificates of compliance (CoCs) from distributors, as general declarations may not capture production batch variations.
No explicit REACH data is included, so if SVHC declarations are required for EU market access, they should be requested separately. The through-hole PDIP package generally does not carry an MSL rating, but the supplier’s storage condition of a dry cabinet with humidity protection suggests sensitivity to moisture that could affect soldering. Verify these handling requirements with the manufacturer’s guidelines to avoid assembly defects.
Availability & Sourcing
The DS1306N+ is an active Maxim Integrated product typically supplied in tube/rail packaging. The file-provided quantity of 155 units offers a snapshot of inventory but does not reflect real-time availability. Prospective buyers should request a current quote from authorized distributors or the manufacturer directly to obtain accurate stock levels and lead times. Given the component’s Active lifecycle, factory lead times are expected to be standard, but verification is recommended for volume procurement.
Counterfeit risk on the open market is reported at 38%, a significant figure that underscores the importance of sourcing only through authorized channels. To ensure component authenticity, procurement teams should require traceability documentation, including date/lot codes, and perform incoming inspection against Maxim Integrated’s datasheet characteristics. Additionally, request RoHS compliance certificates with each shipment to maintain environmental compliance records for your end product.
View the Win-Source product page for DS1306N+.
Engineering Notes for BOM and GEO Use
- Validate the backup battery voltage range and trickle charger settings against the system's power management requirements.
- The DS1306N+ through-hole DIP package is ideal for breadboarding and legacy designs but may require manual assembly in modern SMT lines.
- Counterfeit risk is significant in the open market; insist on authorized distribution traceability and date code verification.