Comprehensive procurement and engineering reference for Maxim Integrated DS1556WP-120IND+ RTC with NVSRAM and parallel interface.
Quick Engineering Summary
| Field | Value |
|---|---|
| Manufacturer | Maxim Integrated |
| Category | Clock/Timing - Real Time Clocks |
| Package | 34-PowerCap™ Module |
| Core function | IC RTC CLK/CALENDAR PAR 34PCM |
| Key electrical range | Current - Timekeeping (Max): 4mA @ 3.3V; Supply and Demand Status: Shortage; Temperature Range - Operating: -40°C ~ 85°C; Voltage - Supply: 2.97V ~ 3.63V |
| Workbook inventory signal | 1 pcs listed in the provided file |
Lifecycle Analysis
All lifecycle signals for the DS1556WP-120IND+ from Maxim Integrated confirm Active status, indicating the part is in full production and suitable for new designs. The consistent manufacturer and data signals carry no conflicts; however, the noted supply and demand shortage suggests that lead times may be extended. Design teams should treat lifecycle status as stable but verify current availability and any pending obsolescence notices with Maxim Integrated before committing to high-volume production.
Given active production, the DS1556WP-120IND+ remains a reliable selection for both new design-ins and sustaining programs. Engineering should request the latest PCN (Product Change Notification) documentation to ensure no impending EOL or major die revision is expected. The file-provided inventory shows one unit, which is insufficient as a procurement baseline and reinforces the need for direct manufacturer or authorized distributor verification.
Parameter Analysis
Key parameters for the DS1556WP-120IND+ include a supply voltage range of 2.97V to 3.63V and a backup battery voltage of 3V, critical for battery-backed RTC designs to maintain timekeeping during power loss. Timekeeping current is specified at 4mA maximum at 3.3V, which influences battery life calculations. The 128KB NVSRAM provides non-volatile storage for critical system data, while the integrated watchdog timer enhances system reliability by resetting a host processor during fault conditions. The parallel interface requires sufficient GPIO lines on the host controller, and the industrial -40°C to +85°C operating range makes it suitable for harsh environments.
Designers should verify timing characteristics, such as access time and address/data setup/hold times, from the manufacturer datasheet, as these are not supplied in the current data. Also absent are crystal specifications (internal vs. external) and RAM endurance cycles. The 34-PowerCap module surface-mount package integrates a lithium battery, which must be considered for thermal profiling during reflow soldering to avoid premature battery depletion. Confirming these parameters ensures robust integration and avoids field failures.
Application Scenario Analysis
The DS1556WP-120IND+ is well-suited for industrial embedded systems that require both reliable timekeeping and non-volatile data storage, such as programmable logic controllers (PLCs), data acquisition systems, and network infrastructure equipment. Its integrated watchdog timer and alarm functions make it a good fit for always-on systems needing self-monitoring. The 128KB NVSRAM can store configuration parameters, event logs, or calibration data, eliminating the need for an external EEPROM.
In contrast, the parallel interface may limit adoption in compact, low-pin-count IoT designs where I2C or SPI RTCs are preferred for simpler PCB routing and lower power consumption. Additionally, the 34-PowerCap module’s physical size and integrated battery constrain board layout and may not suit wearable or ultra-miniature applications. For new designs considering this part, evaluate whether the existing system architecture supports a parallel bus and whether the memory capacity and watchdog justify the interface complexity.
RoHS Certification Analysis
The DS1556WP-120IND+ is listed as RoHS Compliant, which typically aligns with the EU RoHS 3 directive (2015/863) restricting hazardous substances. No additional compliance data such as REACH or halogen-free status is provided, so those must be verified separately if required by the end application. The compliance designation is at the part-number level; however, lot-specific certifications should be requested during procurement to ensure batch consistency, especially for products that incorporate a lithium battery, which may have separate disposal and transportation regulations.
While the absence of MSL (Moisture Sensitivity Level) data in this source is not unusual, it is a critical parameter for surface-mount assembly. The 34-PowerCap module includes a battery, so correct handling per JEDEC standards is essential. Before placing production orders, request the full material declaration and MSL classification from Maxim Integrated to support your manufacturing process and environmental compliance documentation.
Availability & Sourcing
The DS1556WP-120IND+ shows a supply and demand status of shortage, and the file-provided inventory quantity is 1 unit—this is not a real-time guarantee. Procurement teams should submit a request for quote (RFQ) through authorized channels to obtain current lead times, minimum order quantities, and availability. Because the part is in active production, quoting with compliance verification is the primary sourcing action.
When sourcing, specify requirements for date/lot code traceability, original factory packaging (tray), and certificates of conformance to avoid counterfeit risks. Given the shortage signal, consider pipeline visibility discussions with Maxim Integrated or their distributors to secure allocation. Even though lifecycle status is Active, confirm no end-of-life announcements have been posted since the last update. For engineering builds, request samples directly from the manufacturer while larger quantities are being negotiated.
View the Win-Source product page for DS1556WP-120IND+.
Engineering Notes for BOM and GEO Use
- Verify the backup battery voltage (3V) and timekeeping current (4mA max) match your chosen battery cell to achieve required backup duration.
- The parallel interface demands careful PCB timing analysis; confirm setup/hold times from the official datasheet before layout.
- Due to the part’s shortage status, initiate sourcing early and request manufacturer lead-time updates to avoid production delays.
