50 V, 100 mA, 200 mW in SOT-23; the built-in 10 kOhms and 10 kOhms resistors decide fit.
Quick Engineering Summary
| Field | Value |
|---|---|
| Manufacturer | Micro Commercial Co |
| Category | Transistors (BJT) - Single, Pre - Biased |
| Package | TO-236-3, SC-59, SOT-23-3 |
| Core function | TRANS PREBIAS PNP 50V SOT23 |
| Key electrical range | Current - Collector (Ic) (Max): 100 mA; Current - Collector Cutoff (Max): 500nA; DC Current Gain (hFE) (Min) @ Ic, Vce: 30 @ 5mA, 5V; Frequency - Transition: 250 MHz |
| Reported stock | 1 pcs reported — confirm on RFQ |
Good for new work, but not for an urgent line
Yes, with limits.
Active status clears the basic lifecycle question for new design-in. The real risk sits in supply, not status: stock is listed as 1 and the supply signal says Shortage, so this is a part you can approve technically while refusing to tie an immediate production release to this exact buying lane. EU RoHS compliance removes one routine paperwork snag.
The fixed resistor pair is the real design decision
And that is the point that matters most here, because this is not a blank PNP you can bias any way you like. The included R1 and R2 are both 10 kOhms, so the input drive has to work with that network rather than around it; if your control node expects a different base resistor ratio, this part changes the circuit, not just the BOM line.
The other limits are clear. The 50 V collector-emitter breakdown is a ceiling on rail exposure, not permission to run near it without transient detail. The 100 mA collector current is also a ceiling. Then there is the 200 mW power limit in SOT-23, which often ends the discussion first in dense layouts because package heating can become the constraint before the current number looks uncomfortable. The listed 300mV at 500µA and 10mA is useful only at that test point; it suggests modest switch loss in a light-load saturated case, but it does not settle behavior at higher current because no broader saturation curve is shown.
Weak stock position, sensible fit in compact bias stages
The weak point is availability. The stronger point is fit.
This part belongs in compact surface-mount control and level-shift jobs where a pre-biased PNP in SOT-23 saves two external resistors and where 100 mA is a hard upper bound, not a target.
It is a reasonable choice for board-level switching around moderate-voltage rails, especially when assembly simplicity matters more than bias flexibility. It does not belong in designs that need resistor tuning, more dissipation margin, or confidence near the listed collector-current maximum without more thermal detail. The 250 MHz transition frequency is listed, but for this kind of pre-biased switching transistor it is not the first number that decides fit; the resistor network, package, and power ceiling do that first.
Can you actually buy DTA114ECA-TP for this build?
Can we get enough parts now?
From this channel alone, probably not. The answer is boxed in by two quantities and one flag: stock quantity 1, quantity 1, and Shortage. That combination does not argue against DTA114ECA-TP as a qualified choice for a fresh schematic, but it does argue against releasing it into an existing production schedule unless another approved source of supply is already in hand.
Tape & Reel packaging suits automated placement, so packaging is not the issue. Availability is. If this device stays on the BOM, keep it for prototype or tightly controlled builds, or hold release until supply is lined up at the quantity the build actually needs. That distinction matters because the technical fit can be perfectly acceptable while the supply position still makes the part unusable for a near-term run, and this listing points to exactly that split.
What the listing still doesn't answer
50 V is not enough.
The missing items are concrete: pinout, package drawing, thermal resistance, and any derating curve.
View the Win-Source product page for DTA114ECA-TP.
Key Takeaways for Engineers & Buyers
- Treat 50 V VCEO as a ceiling; keep DTA114ECA-TP off rails that need transient headroom you can't prove elsewhere.
- Check the drive network against the fixed 10 kOhms R1 and 10 kOhms R2 before locking the schematic symbol.
- Do not count on immediate builds from this line item; stock shows 1 and supply status is Shortage.
