Diodes Incorporated DXTN07100BP5Q-13 for cautious design-in

DXTN07100BP5Q-13 Diodes Incorporated product image

100 V and 2 A ceilings in PowerDI™ 5, with -55°C to 150°C TJ and a supply picture that needs planning

Quick Engineering Summary

FieldValue
ManufacturerDiodes Incorporated
CategoryTransistors (BJT) - Single
PackagePowerDI™ 5
Core functionTRANS NPN 100V 2A POWERDI 5
Key electrical rangeOperating Temperature Range: -55°C ~ 150°C (TJ); Supply and Demand Status: Limited
Reported stock15039 pcs reported — confirm on RFQ

Lifecycle is the weak point, not the silicon headline

The weak point is lifecycle visibility. On paper, the device is still usable: 100 V, 2 A, surface mount in PowerDI™ 5, with EU RoHS, REACH unaffected, and AEC-Q101 called out in the series field.

Use it for a new build only when unknown lifecycle status is acceptable and Limited supply is something you can plan around.

100 V is the number that decides the first yes or no

100 V is the ceiling that answers the first question.

It tells you whether the part belongs on a rail or node that stays inside that limit. It does not tell you how much transient abuse, switching stress, or avalanche margin it can absorb, because none of that is listed here.

The 2 A figure is also a ceiling, not a working point. That places it in the small power-transistor class rather than signal-only duty, but it still does not settle continuous dissipation on its own. The listing also gives 3.2 W and a junction range of -55°C to 150°C, so the thermal budget still depends on package heat removal and ambient conditions. Get that wrong, and the junction limit bites before the current headline does.

175MHz matters more narrowly. It says the BJT is not especially slow, so it can fit where gain-bandwidth still matters, but it does not stand in for switching waveforms or storage-time data.

Wrong for casual drop-in use, right for compact high-side headroom

Wrong first: this is not the part to choose when you still need the pinout, package drawing, or thermal path before making the footprint call. PowerDI™ 5 identifies the mounting style and package family, but not enough mechanical detail to release a board.

It fits better in a compact surface-mount BJT position that needs more voltage headroom than a typical low-voltage small-signal transistor while staying in a discrete single-transistor footprint. The 100 V ceiling and 2 A ceiling point to clamp, pre-driver, load-switching, or linear-control work where a single NPN still earns its place and through-hole parts are off the table. The AEC-Q101 series tag helps when your qualification flow expects that level, but it does not answer the electrical questions that size the surrounding network.

And this is where the buy call gets real

And this is where the buy call gets real: reel format and moisture handling are not the problem. The part comes as Reel - TR, 5000 per package, and MSL 1 (Unlimited). Availability timing is the problem.

Stock shows 15039, yet supply is marked Limited and estimated production lead time is 25 Weeks. That combination makes this a poor part to leave until the release build, because visible stock does not cancel the scheduling risk implied by the lead time and supply flag.

For a running line, secure the quantity you need while stock exists and avoid open-market cleanup. The listing itself flags a 48 pct. fake threat in the open market, and that is exactly the kind of shortage pressure that turns a routine buy into incoming-inspection pain and field-return noise.

For a new program, commit early or keep it out of the first spin if the schedule cannot absorb that exposure. The remaining gaps are concrete: no pinout, no package drawing, no thermal resistance, and no switching data such as storage time or rise/fall behavior. Those are the missing pieces that close layout, heat, and drive-network decisions.

View the Win-Source product page for DXTN07100BP5Q-13.

Key Takeaways for Engineers & Buyers

  • Check that your rail and transient ceiling stay inside 100 V before assigning DXTN07100BP5Q-13.
  • Match the assembly flow to reel packaging: 5000 per package and MSL 1 (Unlimited).
  • Place the buy early if this stays on the BOM; supply is Limited and lead time is 25 Weeks.