Industrial proximity sensor; sensing distance, supply voltage and output type are absent. Bulk package.
Quick Engineering Summary
| Field | Value |
|---|---|
| Manufacturer | Omron |
| Category | Proximity Sensors - Industrial |
| Core function | SENSOR PROX |
Active status does not clear the E2E RoHS conflict
Design-in stays conditional. The lifecycle fields agree that Omron E2E-X20MD2L18-TR 5M is Active; lifecycle status alone doesn't limit it to sustaining designs. Compliance is the hold: one field says RoHS Compliant, while the specification says RoHS Non-Compliant. EU RoHS status remains unresolved. Reconcile the declarations before placing the sensor on a controlled BOM.
Without sensing distance, the target gap is still open
No sensing-distance number means no fixed target gap. The industrial proximity category cannot establish the sensor’s position relative to its target without that rating, and the absent supply-voltage and output-type entries leave the power rail and controller input unsettled. No ingress-protection rating is listed, so the installation cannot yet be cleared for coolant or washdown exposure.
These gaps cannot be filled from the part number. Get the sensing-distance conditions before setting the fixture position, establish the electrical interface before fixing the input circuit, and confirm the ingress-protection rating before accepting the proposed exposure.
Bulk E2E sensors need an unfrozen installation
A machine build with its sensor position and controller input already frozen is the wrong fit without these characteristics. The sensor remains a candidate for industrial proximity sensing while those choices are open. Bulk packaging also calls for a receiving plan: define how E2E-X20MD2L18-TR 5M will be identified and handled before release to assembly.
View the Win-Source product page for E2E-X20MD2L18-TR 5M.
Key Takeaways for Engineers & Buyers
- Get sensing-distance conditions before fixing the target gap.
- Establish supply voltage and output type before wiring the controller input.
- Reconcile the conflicting EU RoHS declarations before BOM release.