Omron E2E-X3D28-R 5M: Active, but design-in needs evidence

E2E-X3D28-R 5M Omron product image

No supply-voltage or sensing-distance limit listed; bulk packaging and a RoHS conflict govern the next step.

Quick Engineering Summary

FieldValue
ManufacturerOmron
CategoryProximity Sensors - Industrial
Core functionSENSOR PROX

Active status clears one hurdle, not the RoHS conflict

Application limits are missing, and the RoHS entries conflict. Yet Omron E2E-X3D28-R 5M has aligned Active lifecycle and product-status entries; its lifecycle status does not confine it to sustaining designs. New design-in remains conditional on establishing fit and resolving the material declaration.

One field says RoHS Compliant; the specifications say RoHS Non-Compliant. Neither establishes the EU RoHS position for a build that requires it. Resolve the contradiction before release.

Can bulk packaging feed this production line?

Can the line handle bulk packaging? Bulk is the only stated format for E2E-X3D28-R 5M, so settle unit presentation and handling before releasing a running build. No termination is specified, leaving the assembly connection undecided even if bulk handling works.

Does 5M establish a cable or a usable sensing range?

5M appears in the ordering code, but no termination style is specified. It can't establish the cable connection. For E2E-X3D28-R 5M, sensing distance is absent, leaving target clearance open; the supply-voltage limit and output type are also absent, so rail compatibility and the control input remain undecided. Get those limits and a termination drawing before fixing the bracket and wiring. There is no listed voltage or current ceiling to treat as an operating point.

An industrial proximity candidate, not a specified sensor swap

It's wrong for a sensor swap that needs a matching range, rail and output at selection. Its industrial proximity category makes it a candidate for a new sensing position, though that position and its wiring remain open.

View the Win-Source product page for E2E-X3D28-R 5M.

Key Takeaways for Engineers & Buyers

  • Resolve the conflicting RoHS entries before material sign-off.
  • Get the sensing distance and supply-voltage limits before choosing a mounting position or rail.
  • Plan line handling around the stated bulk packaging.