Bulk packaging; key operating limits remain unspecified.
Quick Engineering Summary
| Field | Value |
|---|---|
| Manufacturer | Omron |
| Category | Proximity Sensors - Industrial |
| Core function | SENSOR PROX |
Active status clears only the lifecycle question
Even so, the lifecycle and product-status fields both say Active, so E2E-X3D28-T 2M remains a candidate for new design-in, but that agreement does not clear it for a controlled BOM. The obstacle is elsewhere: the compliance field says RoHS Compliant, while the specifications say RoHS Non-Compliant. EU RoHS status remains unresolved. Settle that conflict before BOM release.
No sensing distance is stated for the target gap
The missing limits constrain the installation: no sensing distance, supply-voltage limit or operating-temperature limit is stated. The target gap and control rail remain unset. So does the operating ambient; Active status doesn't supply operating limits.
The 2M suffix does not establish installation fit
2M appears in the ordering code, not in a documented cable-length field. Treating it as an installation dimension for this industrial proximity sensor could leave the sensing point out of reach. The package is Bulk, so set receiving and line-handling instructions rather than assuming individual packaging. Connection and housing details remain open; this is a candidate for a machine-mounted sensing position, not a specified installation.
Output and termination details still block release
Not ready for a released build. Output type and termination style are unspecified, leaving the controls input and wiring undetermined. An ingress-protection rating is absent, so the installation environment remains an open question. No response-frequency specification is stated for assessing detection of a moving target.
Obtain those four items from the manufacturer datasheet before freezing the electrical and mechanical layout. None changes the Active lifecycle verdict, but a wrong output or connection choice can stop a running line just as surely as a lifecycle change.
View the Win-Source product page for E2E-X3D28-T 2M.
Key Takeaways for Engineers & Buyers
- Resolve the conflicting RoHS entries before releasing the BOM.
- Get sensing distance and supply-voltage limits before setting the target gap or control rail.
- Set receiving and line-handling instructions for Bulk packaging.