Omron E2E-X5D2-TR-N 5M: Hold New Design-In for Now

E2E-X5D2-TR-N 5M Omron product image

Bulk package; supply-voltage and sensing-distance limits unstated, with EU RoHS entries in conflict.

Quick Engineering Summary

FieldValue
ManufacturerOmron
CategoryProximity Sensors - Industrial
Core functionSENSOR PROX

Active status does not settle the RoHS conflict

Pause new design-in. Both lifecycle and product status read Active. The compliance field calls it EU RoHS compliant, while the specifications call it non-compliant; resolve the discrepancy before release, including for existing production.

Missing limits leave target clearance and rail choice open

And that isn't the only hold-up. Without a sensing distance, target clearance is guesswork; without a supply-voltage limit, the machine rail can't be checked against a ceiling, and absent output-type information leaves the controller input undecided. Termination style is missing too. The part name cannot fill those gaps. No voltage, current or temperature ceiling is stated here, so none can be treated as a working setpoint.

Industrial proximity classification is not a mounting spec

A sealed installation is out until its ingress-protection rating is known. Industrial proximity-sensor classification puts it in contention for machine-position detection, but says nothing about mounting geometry or switching speed. Shielding and response frequency are unstated; a crowded metal bracket or fast-moving target needs those answers before layout is fixed.

Bulk packaging needs a line-handling decision

How is it packed? Bulk is the stated packaging, so set the handling method before releasing the BOM line. Active status supports consideration for ongoing production, but it does not resolve the EU RoHS contradiction or supply the sensor details needed to approve the application.

View the Win-Source product page for E2E-X5D2-TR-N 5M.

Key Takeaways for Engineers & Buyers

  • Resolve the conflicting EU RoHS entries for E2E-X5D2-TR-N 5M before release.
  • Get the sensing-distance specification before fixing target clearance.
  • Plan line handling for Bulk packaging.