* Question
What is the goal of software design for terminal nodes? |
* Answer
Data acquisition of analog input and digital input through C language, that is, collecting parameters from electrical equipment in power grid and substation, and classifying data to master the operation status of the substation and the status of electrical equipment in the station;The command, the jump switch, to achieve the purpose of monitoring and control. |
COMMENTS